What happens between the countertop template and the install day

Two weeks can look the same on a calendar and be completely different on a job, depending on whether the slab is already in the shop. A kitchen with no counters is a kitchen without a sink or a range surface, as the notes at riverside kitchen remodeling milestones calendar describe. The stretch from template to install is the one part of a Riverside remodel where the household feels the schedule directly.
What happens at the template visit?

The fabricator measures the cabinet tops, marks the sink and cooktop locations, and confirms the edge profile and overhang. The slab itself, often picked on a trip out toward the University of California Riverside side of town, is usually chosen before this, either at a yard or from a photographed sample. The visit takes an hour or two and the kitchen has to be ready: cabinets set, appliances on hand, sink chosen.
How is the slab laid out?

The shop lays the template over the slab and moves it around to place seams and veining. Veined stone has a direction, and an island that looks right from the dining side can look wrong from the cook side. Anyone particular about pattern should ask to see the layout before cutting begins, since a cut slab is a cut slab.
Where do the fabrication days go?
Cutting, polishing the edge, drilling the faucet holes, and cutting the sink opening each take their own time on the shop floor. Granite and quartz differ in how they cut, and the fabricator may be running other jobs in the queue. Most counters in Riverside, CA come back from shops serving Riverside County in a matter of days to a couple of weeks, depending on that queue.
How is the kitchen managed with no counters?
The old counters usually come off at or just before the template and the sink goes with them. A household can plan around a few meals from a temporary prep table, a hot plate or the grill outside. The Inland Empire summer makes the grill an easier choice than it sounds.
What happens on install day?
The slabs are carried in, dry fit, glued at the seams, and leveled on the cabinet tops. The plumber reconnects the sink and faucet, often the same day or the next morning. A good install ends with the seams checked from a low angle against the light. Ask the fabricator for the install window in writing and keep the plumber booked for the same day, since a counter that arrives without a plumber waiting leaves the sink unusable for another night.